When it comes to the construction of high-rise buildings, self-erecting tower cranes are a natural choice of work equipment. These construction equipment are revered for their ability to lift heavy loads up to several feet up from the ground in a quick and efficient way.

But one thing that should never be compromised when using any tower crane is safety. If you compromise any part of the safety protocol that needs to be followed before your self-erecting tower cranes can be used, the cranes come crushing down at any time, causing severe injuries and destruction of property.

Here are a few common reasons why your self-erecting tower cranes may collapse.

Mechanical failure

Tower crane manufacturers provide end-users of their products with safety protocols that should be followed in order to ensure that the cranes are kept in good working shape. Unfortunately, some construction contractors often fail to follow all equipment inspection and maintenance guidelines meant to ensure safe operation.

Consequently, this may lead to breakdown of key parts of your tower cranes, which can cause the entire equipment to collapse.

Weak foundation base

Tower cranes may collapse due to weak ground support. If the ground on which a tower crane stands is not stable enough, it is easy for the equipment to tip-over. Competent tower crane erectors can ensure that the foundation base of tower cranes is strong enough by taking load and soil data into account. They will also ensure the foundation base of tower cranes is made strong enough to withstand the impact of natural forces such as strong winds.

Poor load control

One of the reasons why crane manufacturers insist that you must use qualified people to operate your cranes is because a lot of skill is required to operate the equipment properly. Tower crane operators who aren't able to balance the weight of loads properly, e.g. by swinging heavy loads, may cause cranes to collapse.

Overloading

Another common reason why a tower crane may come crushing down is when crane operators lift loads that are beyond the equipment's lift capacity. In this case, the crane will not be able to support the full weight of the load being carried, and the crane will end up collapsing.

Ensuring safe operation of tower cranes involves taking all necessary measures required to ensure that the machines do not harm people or cause destruction of property. This responsibility squarely lies with you as a construction manager. For more information, visit sites like http://www.maxilift.com.au/.